FIELD: construction engineering. SUBSTANCE: this particularly relates to building of underground, sunk in ground or ground surface vertical multistory structures. Multitier garage complex has two separate, divided from each other in vertical symmetrical interstory spiral flooring which carries vehicle stalls and approach roads with one-way traffic. Adjacent interstory flooring sections at sites of their adjoining at similar level mark have common horizontal platforms for movement of vehicles from one road to another. Aforesaid embodiment of multitier garage complex allows for simplification of structure and reducing operational expenses. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTILEVEL GARAGE SETUP | 1997 |
|
RU2129197C1 |
METHOD FOR BUILDING UNDERGROUND CONSTRUCTION UNDER COMPLICATED ENGINEERING AND GEOLOGICAL CONDITIONS | 1995 |
|
RU2099473C1 |
MULTI-STOREY GARAGE FOR CARS | 2013 |
|
RU2528812C1 |
MULTISTORIED POWER-OPERATED MONORAIL GARAGE | 1996 |
|
RU2119030C1 |
MULTILEVEL GARAGE | 2002 |
|
RU2220268C2 |
METHOD FOR CAR PARKING, MAINLY IN MEGAPOLISES | 2008 |
|
RU2386764C2 |
MULTI-FUNCTIONAL STRUCTURE | 2012 |
|
RU2511067C1 |
MULTISTORY MECHANIZED GARAGE-PARKING PLACE | 2000 |
|
RU2179616C1 |
MULTIFUNCTIONAL STRUCTURE | 2015 |
|
RU2606718C2 |
MULTILEVEL MERRY-GO-ROUND-SPIRAL PARKING | 2008 |
|
RU2398946C2 |
Authors
Dates
1999-10-10—Published
1997-07-10—Filed