FIELD: process engineering.
SUBSTANCE: invention relates to hydrometallurgy, particularly, to mineral stock dressing devices. Proposed plant comprises reactor, control board, HV transformer, and pulse generator with bank of capacitors. Reactor is composed of rectangular cross-section vertical tube to process dry or wet mineral stock. Shelves are arranged inside said reactor hinged at 45-60 degrees to reactor vertical axis. Said shelves double as grounded electrode. HV electrode is mounted outside the reactor, at hole cut in its wall. Note here that shelf bent edge stays opposite HV electrode head to rest, from inside, onto spring-loaded support to allow vibration of shelves by shock wave effects.
EFFECT: higher quality of raw stock.
2 cl, 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR ELECTROBLASTING ACTIVATION OF WATER PULPS AND SUSPENSIONS | 2011 |
|
RU2470875C1 |
METHOD FOR EXTRACTION OF GOLD FROM CLAY ORE AND TECHNOGENIC RAW MATERIAL | 2012 |
|
RU2496891C1 |
INSTALLATION FOR SELECTIVE DISINTEGRATION OF MATERIALS | 2023 |
|
RU2806425C1 |
INSTALLATION FOR SELECTIVE DISINTEGRATION OF SOLID MATERIALS | 2023 |
|
RU2802344C1 |
METHOD OF PROCESSING COMPLEX GOLD-BEARING ORES, CONCENTRATES AND SECONDARY RAW STOCK | 2011 |
|
RU2467802C1 |
METHOD OF PROCESSING MATERIALS CONTAINING NOBLE METALS | 2000 |
|
RU2176558C1 |
METHOD AND UNIT FOR SELECTIVE DISINTEGRATION OF SOLID MATERIALS | 2014 |
|
RU2569007C1 |
DEVICE FOR PROCESSING OF MATERIALS CONTAINING NOBLE METALS | 2008 |
|
RU2383391C1 |
METHOD AND DEVICE FOR PROCESSING ORES CONTAINING PRECIOUS METALS | 2015 |
|
RU2605012C1 |
PLANT TO SEPARATE CЕC HYDROCARBONS AND HIGHER FROM WATER | 2008 |
|
RU2419480C2 |
Authors
Dates
2013-03-10—Published
2011-08-29—Filed