DOWNHOLE PUMP UNIT Russian patent published in 2013 - IPC F04B47/06 E21B43/14 

Abstract RU 2478832 C1

FIELD: oil and gas industry.

SUBSTANCE: plant is designed for being used in oil industry for oil extraction with well pumps at simultaneous separate operation of two formations of one well. The plant for simultaneous separate operation of two formations in the well includes tubing strings and plunger pumps, suction and delivery valves, which are located in the casing. A linear electric motor is installed between pumps. The plant is equipped with a packer. An annular space is formed between the casing and the linear electric motor. Combined assemblies, the upper one of which includes built-in valves, are installed in upper and lower parts of the casing. It also includes a process hole for direction of an uprising flow of downhole fluid of under-packer zone from annular space to tubing string and a cable entry installation hole. Lower assembly is tightly connected to the casing and to the tubing.

EFFECT: simpler design, higher reliability and provision of separation of downhole fluid flows in under-packer and above-packer zones.

2 cl, 1 dwg

Similar patents RU2478832C1

Title Year Author Number
EQUIPMENT FOR DUAL BED OPERATION FOR OIL- AND GAS-BEARING FORMATIONS IN WELL 2014
  • Danilenko Aleksandr Nikolaevich
  • Sidorov Dmitrij Anatol'Evich
  • Platov Jurij Ottovich
RU2572041C2
APPARATUS FOR PUMPING LIQUID FROM TOP INTO LOWER WELL FORMATIONS (VERSIONS) 2015
  • Nikolaev Oleg Sergeevich
RU2591065C2
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
METHOD FOR SIMULTANEOUS AND SEPARATE DEVELOPMENT OF TWO AND MORE FORMATIONS, AND PLANT FOR ITS IMPLEMENTATION 2011
  • Aleksandrov Petr Olegovich
  • Voskobojnikov Andrej Anatol'Evich
RU2509876C2
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2381352C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
BOREHOLE PUMP UNIT 2012
  • Gabdullin Rivener Musavirovich
RU2506456C1
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS 2014
  • Nikolaev Oleg Sergeevich
RU2542999C2
DEVICE FOR LIQUID INJECTION FROM WATER-BEARING WELL RESERVOIRS IN OIL-BEARING RESERVOIRS 2006
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2310065C1
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS 2009
  • Parijchuk Nikolaj Ivanovich
  • Nagumanov Marat Mirsatovich
  • Aminev Marat Khusnullovich
RU2405925C1

RU 2 478 832 C1

Authors

Lapshin Andrej Vital'Evich

Minenkov Valerij Al'Bertovich

Sidorov Dmitrij Anatol'Evich

Dates

2013-04-10Published

2011-08-30Filed