FIELD: mining.
SUBSTANCE: each layer is developed with the use of utilised vehicle tyres as a support, note that the layer height is taken not more than tyre height or divisible by its other sizes. Backfilling material is supplied to developed space with mounted tyres. The support from utilised tyres is used as shuttering at backfilling material supply. Note that the tyres are mounted close to each other and isolated from backfilling space by material capable to drain water.
EFFECT: increase of speed of layer development, increase of work performance safety, extension of method capabilities.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FORMATION MINING METHOD OF KIMBERLITE PIPE WITH STOWING | 2010 |
|
RU2444626C1 |
METHOD FOR KIMBERLITE PIPE CUTTING IN LAYERS IN UPWARD DIRECTION ALONG WITH GOAF FILLING | 2006 |
|
RU2309253C1 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
PROCESS OF LAYER-BY-LAYER DEVELOPMENT OF KIMBERLITE PIPE IN ASCENDING ORDER WITH BACKFILL AND POWERED COMPLEX FOR METHOD EMBODIMENT | 2001 |
|
RU2203420C2 |
METHOD AND POWERED COMPLEX FOR MINING KIMBERLITE PIPES | 1996 |
|
RU2116447C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES BY MECHANIZED COMPLEX | 1997 |
|
RU2135772C1 |
METHOD OF DEVELOPING THICK STEEPLY DIPPING ORE BODIES | 2014 |
|
RU2558841C1 |
METHOD OF MINERAL DEPOSITS MINING | 0 |
|
SU1809064A1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF PREPARING ORE DEPOSITS TO STOPING | 0 |
|
SU703662A2 |
Authors
Dates
2013-05-10—Published
2012-02-13—Filed