FIELD: oil and gas industry.
SUBSTANCE: when surveying a gas well, its head is equipped with a separator, a gas flow rate measuring device and a flow line for flame. Gas pressure and temperature is measured on the installed device and the well flow rate is determined based on performed measurements and structural characteristics of the device. In addition, the well head is equipped with an electric power plant generating electric power at combustion of produced gas. When surveying high-flow-rate wells, the electric power plant is installed between the gas flow rate measuring device and the flame line. When surveying low-flow-rate wells, the electric power plant is installed before the gas flow rate measuring device.
EFFECT: use of produced gas during survey of gas wells for generation of electric power.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF FRAMING OF CLUSTER OF OPERATIONAL GAS-CONDENSATE AND OIL WELLS | 2002 |
|
RU2223399C1 |
METHOD FOR SURVEY OF GAS AND GAS-CONDENSATE WELLS | 2009 |
|
RU2405933C1 |
METHOD FOR DETERMINING OUTPUT OF OPERATING GAS WELL | 1992 |
|
RU2087704C1 |
METHOD AND DEVICE FOR OIL WELL OPERATION OPTIMIZATION ALONG WITH OIL WELL PRODUCTIVITY CHANGE | 2005 |
|
RU2318988C2 |
METHOD OF OPTIMIZATION OF THE PERIODICITY OF GASDYNAMIC WELL RESEARCH ON OIL AND GAS CONDENSATE FIELDS OF THE EXTREME NORTH | 2017 |
|
RU2661502C1 |
OPERATING METHOD OF WELLS AND GAS COLLECTION SYSTEM DURING COMPRESSOR PERIOD OF DEVELOPING GAS AND GAS CONDENSATE FIELDS | 2007 |
|
RU2346147C1 |
PROCEDURE FOR COLLECTION AND TRANSPORTING MULTI-PHASE MIXTURE FROM REMOTE CLUSTERS OF WELLS | 2009 |
|
RU2411409C1 |
MOBILE SYSTEM FOR YEAR-ROUND SURVEY OF OIL AND GAS WELLS | 2015 |
|
RU2616038C1 |
PLANT FOR MEASURING AND STUDY OF WELL PRODUCTS | 1995 |
|
RU2100596C1 |
METHOD FOR DETERMINATION OF PRODUCTION RATE OF WELLS' PRODUCTION | 2006 |
|
RU2325520C2 |
Authors
Dates
2013-06-10—Published
2012-01-17—Filed