FIELD: oil and gas industry.
SUBSTANCE: method consists in preliminary cleaning of gas supplied from the inlet header of main gas line, its compression in a process compressor of a gas transfer unit, cooling of transported gas, supply to the outlet header of the main gas line for further transportation. Cooling is performed additionally in a unit of recuperative heat exchangers. A compressor station includes an inlet header of the main gas line, a cleaning unit, a turbo-expander plant, inlet shutoff valves, a gas transfer unit with a process compressor and its drive, outlet shutoff valves, a gas cooler and a unit of recuperative heat exchangers connected in series or parallel, and an outlet header of the main gas line.
EFFECT: reduction of power costs for gas compression and improving the efficiency of gas transfer methods and compressor stations.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR GAS TRANSPORTATION (VERSIONS) AND COMPRESSOR PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2009 |
|
RU2418991C1 |
GAS PUMPING COMPRESSOR STATION (VERSIONS) | 2014 |
|
RU2543710C1 |
GAS PUMPING UNIT AND METHOD OF ITS START-UP | 2014 |
|
RU2607113C2 |
COMPRESSOR STATION OF THE MAIN GAS PIPELINE WITH A GAS TURBO EXPANDER UNIT | 2021 |
|
RU2795803C1 |
NATURAL GAS LIQUEFACTION SYSTEM AT MAIN GAS LINE COMPRESSOR STATION | 2019 |
|
RU2694566C1 |
COMPRESSOR STATION FOR GAS CONDITIONING BEFORE ITS DELIVERY TO GAS-MAIN PIPELINE | 2007 |
|
RU2339871C1 |
NATURAL GAS LIQUEFACTION SYSTEM AT COMPRESSOR STATION OF MAIN GAS PIPELINE | 2023 |
|
RU2812844C1 |
LINE COMPRESSOR STATION | 2004 |
|
RU2279011C2 |
COMPRESSOR STATION FOR GAS PIPELINE | 2004 |
|
RU2277670C2 |
PRESSURE INCREASING COMPRESSOR STATION OF GAS CONDUIT | 2004 |
|
RU2279012C2 |
Authors
Dates
2013-06-10—Published
2012-01-11—Filed