FIELD: mining.
SUBSTANCE: spaced-filled tamping consists of section above charge of ES (explosive substance) or air interval filled with loose material; metal spacing tamping is located above this section; tamping is made, for example in form of hollow cylinder cut along axis wherein hollow spacing cone is inserted from beneath. The tamping out of inert material is filled from top onto the metal spacing tamping at height not less, than three diametres of a borehole. The section above charge or air interval is filled with loose material at height of diametre of the borehole.
EFFECT: increased efficiency of explosive rock breaking due to blockage of products of detonation in charge cavity and elimination of metal tamping escape from borehole after destruction of rock around it.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED STEMMING | 2006 |
|
RU2312303C1 |
COMBINED STEMMING | 2020 |
|
RU2732777C1 |
COMBINED ORGANIC PLUG | 2010 |
|
RU2439484C1 |
COMBINATION CHARGING TAMPING | 2006 |
|
RU2307311C1 |
COMBINED CHARGING TAMPING OF WELLS | 2011 |
|
RU2462688C1 |
COMBINATION STEMMING | 2006 |
|
RU2308674C1 |
COMBINED EXPANSION-FILL PLUG | 2008 |
|
RU2371669C1 |
FILL STEMMING OF BLAST HOLES WITH ELEMENTS OF STONE MATERIAL | 2013 |
|
RU2526950C1 |
METHOD OF FORMING SHORT COMBINED FILLED STEM OF BLAST HOLES WITH SPACER CONE AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2608101C1 |
COMBINED WEDGEABLE STEMMING PLUG | 2006 |
|
RU2329434C1 |
Authors
Dates
2010-05-27—Published
2009-03-18—Filed