FIELD: construction.
SUBSTANCE: dam of soil materials, both frozen and thawed types, is erected on a frozen base. The soil dam comprises an anti-filtration core 1, upper and lower thrust prisms 2, transition zones 3 and 4 between the core 1 and thrust prisms 2. The core 1 of the dam consists of a low-filtering cohesive soil. Thrust prisms 2 are made of stone rip-rap. The slope of the lower thrust prism is covered with a layer of fine stone 5. At the same time in the lower thrust prism with the help of an air impermeable screen 6 there is an area of seasonal active convection 7. The screen 6 is made of thin rubberised fabric or cemented stone. The area of seasonal-active convection 7 is equipped with a hangar 8 and a detachable air impermeable cover 9 arranged on the lower slope. The hangar 8 is located on the dam ridge.
EFFECT: permanent temperature mode in a core and in a transition area at the side of a lower reach, when operating both thawed and frozen soil dam under severe temperature conditions of a northern construction climate area.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
SOIL MATERIAL DAM | 2015 |
|
RU2609439C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474645C1 |
EARTH DAM OF FROZEN TYPE | 1992 |
|
RU2029016C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474646C1 |
GROUND DAM IN THE PERMAFROST ZONE FREEZING SYSTEM AND DAM WITH ITS APPLICATION | 2017 |
|
RU2665097C1 |
EARTH-FILL DAM OF FROZEN TYPE | 2006 |
|
RU2309219C1 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2307891C1 |
EARTH DAN OF PERMAFROST BASE | 2003 |
|
RU2250296C1 |
METHOD FOR FROZEN EARTH-FILLED DAM ERECTION | 2004 |
|
RU2310035C2 |
METHOD FOR ERECTION OF EARTH DAM | 1993 |
|
RU2049193C1 |
Authors
Dates
2013-06-27—Published
2010-07-06—Filed