FIELD: hydraulic engineering. SUBSTANCE: method for erection of earth dam includes marking with geodetic marks. of main longitudinal axis 1; combining of longitudinal axis contour of downstream face foot; calculation of distance to central axis of dam which usually serves as axis of impermeable member and dam crest, and its layout; calculation and laying out of contour of upstream face foot 3 from axis 1; layer-by-layer filling of dam members only in direction of upper pool from main axis. Plan contour of dam crest is formed in form of curve convex directed to upper pool. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
EARTH DAM OF FROZEN TYPE | 1992 |
|
RU2029016C1 |
METHOD FOR FROZEN EARTH-FILLED DAM ERECTION | 2004 |
|
RU2310035C2 |
LOCAL MATERIAL DAM | 1990 |
|
RU2007510C1 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
EARTH DAM WITH STONE ARRESTING PRISMS | 0 |
|
SU1114727A1 |
ANTI-FILTRATION MEMBRANE OF LOW-HEAD DAMS AND DYKES FROM SOIL MATERIALS | 2013 |
|
RU2539147C2 |
METHOD OF STORING AND STORAGE OF SALINE ROCKS IN PERMAFROST REGIONS | 1998 |
|
RU2150581C1 |
DAM MADE OF SOIL MATERIALS | 0 |
|
SU1060748A1 |
METHOD FOR RESTORING THE GEOPHYSICAL STABILITY OF AN EMERGENCY GROUND DAM ON A WEAK FOUNDATION | 2020 |
|
RU2763752C1 |
EARTH-FILL DAM OF FROZEN TYPE | 2006 |
|
RU2309219C1 |
Authors
Dates
1995-11-27—Published
1993-06-22—Filed