FIELD: oil and gas industry.
SUBSTANCE: development method of wet oil formation includes pumping of water-shutoff agent to wet formation of a production well; pumping of nonionic surfactant through injection well and oil withdrawal through a production well. In process of the method implementation premixed solution of water-shutoff agent is made of 8-15% solution of polyaluminium chloride with pH=3.5-5 based on 0.05% water solution of acrylamide polymer DP9-8177; the solution is pumped into production well in volume equal to 0.1 of pore volume for the most permeable interlayer and thereafter the well is hold within 24-36 hours. Then solution of nonionic surfactant is pumped through injection well, the well is shut off for process suspension for the period of 24-72 hours and oil is withheld through production well.
EFFECT: increase of efficiency for development of wet carbonate formation due to prolongation of water-shutoff capacity and increase of oil flow rate in wet strata notwithstanding salt content of stratal waters.
3 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WATER INFLOW LIMITATION IN FLOODED CARBONE RESERVOIRS | 2016 |
|
RU2619778C1 |
WATER INFLOW SHUTOFF METHOD IN FRACTURED CARBONATE RESERVOIRS | 2014 |
|
RU2571474C1 |
PROCEDURE FOR REGULATION OF INTAKE CAPACITY PROFILE OF PRESSURE WELL (VERSIONS) | 2009 |
|
RU2398958C1 |
METHOD OF WATER INFLOW LIMITATION IN FRACTURED CARBONE RESERVOIRS | 2015 |
|
RU2614997C1 |
LIMITATION OF WELL WATER PRODUCTION | 2013 |
|
RU2525079C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT | 2015 |
|
RU2592005C1 |
METHOD OF TREATMENT OF NONUNIFORM OIL-GAS FORMATIONS | 2001 |
|
RU2208136C2 |
METHOD FOR NON-UNIFORM OIL POOL DEVELOPMENT CONTROL | 2005 |
|
RU2279540C1 |
METHOD OF DEVELOPMENT FOR WET OIL STRATA WITH INHOMOGENEOUS PERMEABILITY | 2011 |
|
RU2487234C1 |
METHOD OF WATER PRODUCTION ZONES ISOLATION IN WELL | 2012 |
|
RU2507377C1 |
Authors
Dates
2013-07-10—Published
2012-04-12—Filed