FIELD: mining.
SUBSTANCE: method includes separate extraction, movement and piling of soil layer and stripping rocks, mining of a quarry field, filling of the mined space of the pit with construction wastes and further compaction. Then terracing is carried out at one of pit slopes with the help of a bulldozer. Places for burial of remains are arranged on terraces. On the other slope of the pit a vertical wall is arranged for burial of urns with ashes of deceased, where horizontal rows of niches are arranged, being made by means of horizontal pushing of pipe sections of rectangular cross section.
EFFECT: reduced labour inputs and cost of recovery works, rational use of land areas.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RECOVER ABANDONED PITS | 2010 |
|
RU2443865C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448251C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448252C1 |
METHOD TO RESTORE MINED-OUT QUARRIES FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2011 |
|
RU2491423C2 |
METHOD TO RESTORE MINED PITS FOR CONSTRUCTION OF CEMETERY | 2012 |
|
RU2496983C1 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
METHOD TO RESTORE ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2529037C1 |
METHOD TO RESTORE BARROW PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2515012C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY | 2015 |
|
RU2611749C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
Authors
Dates
2013-07-10—Published
2011-12-27—Filed