FIELD: construction.
SUBSTANCE: method includes separate mining, movement and piling of soil layer and stripping rocks into separate belt dumps, mining of a open-pit field, filling of the mined space to the border of the upper level of ground waters with construction wastes. Afterwards they perform design and planning works to construct roads, passages, hydraulic engineering and land reclamation structures. Then they start filling the mined space in two stages. At first they do the primary filling of the mined space of the pit with a mix made of stripping rocks and ground construction debris with fraction size of the latter of not more than 100 mm mixed in equal proportions. Filling is done until complete filling of the mined space of the pit, then along the surface planned by a bulldozer they apply on top a layer of a soil mixture with seeds of perennial herbs of meadow-weed group, and final planning is carried out not sooner than in one year. Then the planned surface is ploughed, with subsequent levelling and filling of the entire surface of the mined space with a layer of sand with thickness of at least 100 mm with subsequent light levelling. Afterwards roads are connected, hydraulic engineering and land reclamation structures are arranged, and the entire surface of the planned surface of the mined space is divided into sections, in each one they perform burials of certain years and for the standard depth of burial.
EFFECT: reduced labour inputs for restoration works, protection of soil against wind and water erosion.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RESTORE ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2529037C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY | 2015 |
|
RU2611749C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF CEMETRY | 2015 |
|
RU2611750C1 |
METHOD TO RECOVER ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2011 |
|
RU2487241C1 |
METHOD FOR RECLAIMING TERRITORIES DAMAGED BY OPEN EXTRACTION OF DEPOSITS | 2006 |
|
RU2289695C1 |
METHOD TO RESTORE MINED PITS FOR CONSTRUCTION OF CEMETERY | 2012 |
|
RU2496983C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448251C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448252C1 |
METHOD FOR RESTORATION OF BARROW PITS FOR CONSTRUCTION OF STRUCTURES | 2008 |
|
RU2381365C1 |
Authors
Dates
2014-05-10—Published
2013-03-28—Filed