FIELD: mining.
SUBSTANCE: method involves extraction of ore reserves to the height of up to 8 m by means of a non-benching working face in vertical plane using self-propelled equipment, removal of mined rock and its transportation, supporting of the roof by leaving safety chain pillars 2.5 m wide, reinforcement of the roof with anchors. Extraction work of ore reserves is performed simultaneously in three working faces; at that, one of the main operations of the bottom-hole cycle is performed in each working face every month: drilling of wells and breaking of ore, removal of mined rock, reinforcement of the roof and walls of shrink stoping. Mined rock is transported from bottom-hole space to ascending ore space is performed by means of a loading and hauling machine, and from ascending ore space to ore chute with a drag-type conveyor. When reinforcing the roof and walls of shrink stoping to anchors there attached is polymer or wire mesh.
EFFECT: improving development efficiency of a minefield due to stream-lining of operation of the bottom-hole cycle and reliable reinforcement of the roof.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF FLAT AND INCLINED THICK ORE BODIES | 2011 |
|
RU2472932C1 |
METHOD OF MINING HORIZONTAL AND SLOPING MINERAL DEPOSITS | 0 |
|
SU907257A1 |
METHOD FOR INCLINED ORE DEPOSIT DEVELOPMENT | 2006 |
|
RU2307936C1 |
METHOD FOR WORKING PILLARS IN ROOM-AND-PILLAR MINING SYSTEM | 0 |
|
SU1828921A1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU1121438A1 |
METHOD OF MINING OF INCLINED ORE DEPOSITS | 2001 |
|
RU2215147C2 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU705110A1 |
METHOD FOR SUBTERRANEAN EXCAVATION OF MINERAL DEPOSITS BY MEANS OF CHAMBER-COLUMN METHOD | 2002 |
|
RU2232894C1 |
0 |
|
SU589406A1 |
Authors
Dates
2013-07-27—Published
2012-01-31—Filed