FIELD: process engineering.
SUBSTANCE: proposed comprises drawing of round billet and application of trilateral die-rolled section thereon. Production of reinforcing wire for prestressed concrete structures with cross-section approximating to circle is ensured by drawing round billet at total reduction of 55-61% before application of die-rolled section. Said section is applied by shaping the round biller cross-section to arrow-like triangle by plain rolls with concave working surface in radius making at least 5 radii of said round billet. Then, periodic dents are applied on arrow-like triangle by shaping rolls at total reduction of 5-8%. Note here that spacing between axles of sets of plain rolls and those of shaping rolls making 0.6-0.7 of their diameter.
EFFECT: higher precision of shape and sizes of reinforcing wire.
3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD TO FABRICATE REINFORCEMENT WIRE | 0 |
|
SU1720768A1 |
METHOD OF PERIODICAL SHAPE REINFORCING STEEL PRODUCTION | 1993 |
|
RU2070448C1 |
REINFORCEMENT ROPE AND METHOD OF ITS MANUFACTURING | 2009 |
|
RU2431024C2 |
METHOD OF MANUFACTURING A REINFORCEMENT ROPE | 2018 |
|
RU2705668C1 |
APPARATUS FOR MAKING REINFORCEMENT SECTION | 1992 |
|
RU2040987C1 |
REINFORCEMENT STEEL PRODUCING METHOD | 2005 |
|
RU2288061C1 |
METHOD OF MAKING HIGH-STRENGTH VARIOUS-DIAMETER WIRE REINFORCEMENTS | 2012 |
|
RU2502573C1 |
PLANT FOR PRODUCTION OF REINFORCING BAR STEEL | 2005 |
|
RU2286223C1 |
METHOD FOR MANUFACTURING DIE-ROLLED REBAR | 2007 |
|
RU2333059C1 |
REINFORCING WIRE PRODUCTION METHOD | 2006 |
|
RU2302916C1 |
Authors
Dates
2013-10-27—Published
2011-12-26—Filed