FIELD: transport.
SUBSTANCE: invention relates to recovery of structures of industrial and civil buildings, primarily, heat and power plants. Prefabricate casing is produced at metalworks consisting of channel-like bent prefabricated elements with aligned holes in flanges and connection sheets following the cantilever outer surface, and retainer with holes at its brackets for casing suspension. Concrete damaged protective layer is removed from corroded column outline and finished prefabricated casing elements are transferred into the shop. Retainer is installed so that its ends extend beyond column sides to install casing bottom part. Casing upper part is mounted on aligning coaxial holes in casing tip and bottom flanges to joint said edges by bolts. Concrete pipelines are connected to casing pipes to force fine expanding concrete via said pipes into casing "from bottom-to-top" to integrate said casing and said column. At cementation, dangerous cantilever is squeezed by the casing on all sides, prestressed to render the cantilever an integral concrete tube of recovered serviceability.
EFFECT: complete recovery of column serviceability.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMPLETE RELIEF OF COLUMN REINFORCED CONCRETE CANTILEVER | 2011 |
|
RU2496709C2 |
METHOD TO RECOVER BEARING CAPACITY OF PILLARS OF REINFORCED CONCRETE SYMMETRICAL CANTILEVERS THAT ARE DAMAGED IN MIDDLE ROW | 2010 |
|
RU2477776C2 |
METHOD OF DAMPING OVERHEAD CRANE EFFECTS AND UNLOADING REINFORCED-CONCRETE SUPPORT OF COLUMN DISINTEGRATING FROM CONCRETE REINFORCEMENT CORROSION | 2010 |
|
RU2457998C2 |
METHOD FOR COMPLETE UNLOADING OF REINFORCED CONCRETE CANTILEVER OF COLUMN AGAINST ACTION OF CRANE BEAMS | 2011 |
|
RU2469948C2 |
METHOD OF REDUCING THE SERVICE LIFE OF THE EMERGENCY RUNWAY BEAMS | 2014 |
|
RU2583116C2 |
METHOD TO MANUFACTURE GUNCRETE ELEMENTS OF STEEL DOUBLE-BRANCH PILLAR | 2011 |
|
RU2477773C1 |
METHOD OF MAKING COMPOSITE ARCH | 2013 |
|
RU2553688C1 |
REHABILITATION METHOD OF WELDING CRANE BEAM DAMAGED WITH FATIGUE CRACKS | 2009 |
|
RU2460621C2 |
AUTOMATED METHOD TO ERECT STRUCTURE FRAME | 2011 |
|
RU2495987C2 |
METHOD TO UNLOAD EMERGENCY REINFORCED CONCRETE CANTILEVER THAT EXHAUSTED ITS BEARING CAPACITY AS RESULT OF CONCRETE AND REINFORCEMENT CORROSION | 2008 |
|
RU2415239C2 |
Authors
Dates
2013-10-27—Published
2012-01-10—Filed