FIELD: construction.
SUBSTANCE: method to manufacture a superstructure system includes the following stages: concreting of a solid foundation slab (1) in the track base, installation and alignment of concrete support elements (2) under rails, laying of rails (4) and their fixation to each other. As the foundation slab (1) is concreted, its surface height elevation (5) is arranged with a minus allowance. Simultaneously with installation and alignment of concrete support (2) elements, metal plates (6) are laid under rails (4) on the surface (5) of the foundation board (1), and the thickness of each of them is determined on the basis of levelling results. After fixation of rails (4) to each other they concrete the entire superstructure from the foundation slab (1) to the level of rolling surfaces (7) of rail heads (4).
EFFECT: increased efficiency of labour and reliability of operation of the entire structure as a whole.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF RAILWAY TRACK STRUCTURE WITHOUT CRUSHED-STONE BALLAST | 1995 |
|
RU2148685C1 |
METHOD OF AND MACHINE FOR MAKING AND SETTING RAIL SUPPORT POINTS IN CORRECT POSITION | 1995 |
|
RU2151230C1 |
METHOD OF ERECTING A BUILDING FROM MONOLITHIC CONCRETE | 0 |
|
SU773229A1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
METHOD OF COMBINED BUILDING OF UNDERGROUND AND ABOVE-GROUND PART OF FRAME STRUCTURE | 2017 |
|
RU2657565C1 |
CAR TRACK ON CONCRETE BASE | 2012 |
|
RU2493313C1 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
METHOD FOR ERECTION OF MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAME OF BUILDING | 2008 |
|
RU2382852C1 |
METHOD OF MONOLITHIC BUILDING ERECTION AND MOVABLE FRAMEWORK FOR ITS REALIZATION | 1993 |
|
RU2078884C1 |
MOBILE CONCRETE-PLACING MACHINE AND METHOD OF ITS OPERATION | 1995 |
|
RU2148688C1 |
Authors
Dates
2013-11-10—Published
2012-05-11—Filed