FIELD: construction.
SUBSTANCE: invention relates to construction, namely, to foundations of buildings and structures erected on gravel-sand soils. Method of erection of slab-type reinforced concrete foundation includes excavation of excavation, laying of reinforcement on base, concreting of foundation plate with subsequent hardening and erection of foundation over-foundation parts. Excavation of excavation is carried out to mark at (0.4–0.6)h above design foundation marking mark, where h is projected thickness of foundation. Laying of reinforcement and concreting foundation plate with through holes, after curing of which the above-foundation parts of the building are erected, and through the through holes of the slab the polymer solution is supplied into the gravel-sand soil till formation of the lower polymer-concrete layer with thickness of (0.5–0.8)h, after hardening of which the carrying capacity of the foundation is achieved.
EFFECT: technical result consists in reduction of material consumption, minimum labor input, reduction of construction period of building and structure.
3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
METHOD FOR HIGHLY-RIGID PLATE FOUNDATION ERECTION | 2006 |
|
RU2303106C1 |
METHOD FOR DAMP-PROOFING OF BELOW-GRADE BUILDING | 2006 |
|
RU2333321C1 |
METHOD OF SECURING WEAK SOIL AT THE BASE OF A FOUNDATION SLAB | 2023 |
|
RU2807344C1 |
LOW-RISE HOUSE CONSTRUCTION METHOD | 2023 |
|
RU2816140C1 |
STRIP-MEMBRANE SUBSURFACE FOUNDATION | 2021 |
|
RU2752890C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
METHOD OF ERECTING HIGH-RISE BUILDING ON NATURAL BASE | 2016 |
|
RU2634762C1 |
METHOD OF SLAB-PILE FOUNDATION ERECTION | 2006 |
|
RU2328576C1 |
BUILDING AND CONSTRUCTION ERECTING METHOD, AND DEVICE FOR METHOD'S IMPLEMENTATION | 2007 |
|
RU2369692C2 |
Authors
Dates
2019-06-24—Published
2018-10-30—Filed