FIELD: mining.
SUBSTANCE: method includes explosion of a rock mass above a coal bed and explosion of a coal bed. Drilling of wells is carried out with underdrilling to the coal bed soil. A decked charge is formed in wells. At the same time the air gap is arranged so that the distance from the contact of rock-coal to the charge arranged in the rock and coal parts of the massif is equal, more or equal to the radius of the crushing zone, accordingly.
EFFECT: invention makes it possible to reduce outages of mining transport equipment, to reduce number of blast-hole drilling operations, to eliminate damage of bed roof and dilution of coal in a contact zone.
Title | Year | Author | Number |
---|---|---|---|
DRYING METHOD OF BLOCK TO BE EXPLODED DURING DIRECT COAL EXTRACTION TECHNOLOGY | 2010 |
|
RU2452859C1 |
DRYING METHOD OF ROCK-COAL MASSIF | 2010 |
|
RU2454541C1 |
METHOD OF DUST SUPPRESSION DURING BLASTING WORKS IN PITS | 2012 |
|
RU2513731C1 |
METHOD OF CONDUCTING DRILLING AND BLASTING OPERATIONS WITH SHIELDING | 2016 |
|
RU2630004C1 |
WELL STEMMING METHOD | 2010 |
|
RU2435132C1 |
STRIP MINING OF MINERALS INCLUDING WORKING OF ORE BODIES IN CONTACT BETWEEN ORE AND CAPPING IN SUB-BENCHES | 2013 |
|
RU2524716C1 |
METHOD FOR EXPLOSIVE DESTRUCTION OF VARIOUS COHERENCE ROCK MASSIF WITH DISTRIBUTED AND SHORTENED BLASTHOLE CHARGES WITH CUMULATIVE EFFECT | 2015 |
|
RU2594236C1 |
SUSPENSION WELL STEMMING | 2012 |
|
RU2506533C1 |
SUSPENDED BOREHOLE PLUG | 2008 |
|
RU2371671C1 |
SUSPENSION WELL STEMMING | 2009 |
|
RU2409805C1 |
Authors
Dates
2013-11-10—Published
2012-05-22—Filed