FIELD: mining.
SUBSTANCE: method includes preliminary drilling of one or several rows of blasting wells in rock-coal massif. During preparation to drying of rock-coal massif, blasting wells are drilled in line on working platforms of rock-coal massif along outline of dried rock-coal massif at a distance 3-5 m from each other, at that wells are drilled with subdrilling 1-3 m below mark of low dried projection, maximum height of dried rock-coal massif is limited by maximum drilling depth of drilling machine.
EFFECT: reducing the cost of rock mass to be exploded due to use of explosives non-resistant to water as a result of drying of the rock-coal massif to be exploded.
1 ex, 3 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| DRYING METHOD OF BLOCK TO BE EXPLODED DURING DIRECT COAL EXTRACTION TECHNOLOGY | 2010 | 
 | RU2452859C1 | 
| FORMATION METHOD OF COMPOUND BLAST | 2008 | 
 | RU2364828C1 | 
| COMBINED CHARGE SHAPING METHOD | 2010 | 
 | RU2425324C1 | 
| METHOD TO PERFORM BLASTING WORKS | 2012 | 
 | RU2498210C1 | 
| METHOD FOR ROCK BLASTING IN OPEN PIT | 1992 | 
 | RU2044998C1 | 
| METHOD TO CHARGE WEAKLY WATER-CUT DOWNHOLES | 2011 | 
 | RU2482442C1 | 
| OPEN-CAST MINING METHOD | 0 | 
 | SU1089261A1 | 
| PROCESS OF WORKING OF ROCK MASS CLOSE TO CONTOUR WITH FORMATION OF BENCHES OVER LIMIT OUTLINES OF EDGES OF PITS | 0 | 
 | SU1818472A1 | 
| WELL CHARGING METHOD | 2024 | 
 | RU2823312C1 | 
| METHOD OF DUST SUPPRESSION DURING BLASTING WORKS IN PITS | 2012 | 
 | RU2513731C1 | 
Authors
Dates
2012-06-27—Published
2010-12-27—Filed