FIELD: mining.
SUBSTANCE: block to be exploded is drilled around the perimeter of its connection to rock mass by means of a row of wells in 3-4 metres. At that, during preparation for drilling and explosion loosening the well rocks in the row are drilled to the depth below the coal formation through the distance excluding the formation destruction during explosion of row by means of base charge.
EFFECT: reducing the cost of rock mass to be exploded owing to using explosives non-resistant to water as a result of drying of the block to be exploded.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DRYING METHOD OF ROCK-COAL MASSIF | 2010 |
|
RU2454541C1 |
METHOD TO PERFORM BLASTING WORKS | 2012 |
|
RU2498210C1 |
METHOD OF DUST SUPPRESSION DURING BLASTING WORKS IN PITS | 2012 |
|
RU2513731C1 |
BOREHOLE GAP DEVICE | 2021 |
|
RU2754692C1 |
WELL CHARGING METHOD | 2024 |
|
RU2823312C1 |
SUSPENDED BOREHOLE TAMPING | 2009 |
|
RU2401416C1 |
SUSPENDED BOREHOLE STEM | 2021 |
|
RU2768270C1 |
SUSPENDED WELL STEM | 2018 |
|
RU2699102C1 |
METHOD OF CONDUCTING DRILLING AND BLASTING OPERATIONS WITH SHIELDING | 2016 |
|
RU2630004C1 |
SUSPENDED WELL STEM | 2019 |
|
RU2713833C1 |
Authors
Dates
2012-06-10—Published
2010-10-26—Filed