FIELD: construction.
SUBSTANCE: each crossbar is concreted with support cantilevers, in a groove is made in the pillar. Connecting elements of the crossbar are made in the form of a steel rope with clamp couplings pressed at its ends. Concrete extraction is continued until the working reinforcement of the pillar is exposed. The crossbar comprises support cantilevers from a steel rolled shape with protrusion outside the limits of the crossbar end. Each of rope elements is preliminarily folded in two to form a loop protruding beyond the end of the crossbar. Ends of rope elements are solidified in the body of the crossbar. Then crossbars are installed into the design position relative to the pillar. Afterwards in the pillar recess they bend the loops of ropes, which are inserted between the working reinforcement of the pillar, and then spread into the design position. Additional reinforcement rods are placed inside the loops of the ropes. Afterwards the formwork and the node of connection are installed in the volume of the recess and filled with concrete.
EFFECT: lower labour intensiveness of assembly, increased operational capabilities and reliability.
9 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIVERSAL HOUSE-BUILDING SYSTEM | 2014 |
|
RU2585330C2 |
METHOD FOR CONSTRUCTION OF MONOLITHIC STRUCTURES OF BUILDINGS AND NON-REMOVABLE UNIVERSAL MODULAR FORMWORK SYSTEM | 2014 |
|
RU2552506C1 |
FLAT REINFORCED CONCRETE AND SOLID FLOORING WITH GIRDER AND HOLLOWS IN FRAMED BUILDINGS | 2007 |
|
RU2341626C1 |
COLLAPSIBLE-MONOLITHIC FRAMING OF BUILDING | 2011 |
|
RU2453662C1 |
NODAL COUPLING OF PILLAR WITH MONOLITHIC SLAB | 2012 |
|
RU2547035C2 |
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM | 2016 |
|
RU2634139C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
PREFABRICATED-MONOLITHIC FRAME OF BUILDING OF REINFORCEMENT-LOOP ASSEMBLY WITH ITS BEARING ELEMENTS | 2019 |
|
RU2714777C1 |
BUTT JOINT OF FERROCONCRETE COLLAR BEAMS AND PYLON | 0 |
|
SU1761887A1 |
FRAME JOINT OF PREFABRICATED REINFORCED CONCRETE FRAMEWORK | 2015 |
|
RU2611134C1 |
Authors
Dates
2013-11-20—Published
2012-05-05—Filed