FIELD: construction.
SUBSTANCE: flooring consists of girders 3, beams 4, top 5 and bottom 6 slabs and includes hollows 9 formed between the said slabs. Top 5 slabs are embedded into girders 3 and beams 4. Bottom slabs 6 are suspended to top slabs 5 and rest on side edges of girders 3 and beams 4 framing bottom slabs 6.
EFFECT: reduction of concrete and reinforcement consumption, reduction of construction period and significant increase of aisles in building frame.
4 cl, 20 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT SITE-CAST SKELETON BUILDING WITH DECORATIVE OUTER FINISH | 2009 |
|
RU2421580C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
UNIVERSAL HOUSE-BUILDING SYSTEM | 2014 |
|
RU2585330C2 |
STRUCTURE OF MONOLITHIC HOLLOW REINFORCED CONCRETE FLOOR FOR CONSTRUCTION AND RECONSTRUCTION OF FACILITIES | 2023 |
|
RU2824747C1 |
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM | 2016 |
|
RU2634139C1 |
LARGE-BLOCK BUILDING AND METHOD TO MANUFACTURE ITEMS FOR ITS ERECTION | 2012 |
|
RU2498024C1 |
METHOD OF MULTISTOREY BUILDING CARCASSING | 2007 |
|
RU2338843C1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107784C1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
CONSTRUCTION METHOD FOR DOUBLE-SIDED MUTUALLY STRESSED REINFORCED CONCRETE WALL STRUCTURE WITH HEAT-INSULATION VOIDS | 2005 |
|
RU2323307C2 |
Authors
Dates
2008-12-20—Published
2007-06-14—Filed