FIELD: mining.
SUBSTANCE: proposed method comprises development of quarry field in steps, land filling of external and internal piles in mined out space of man-made deposit of off-grade ores. In formation of mined out space, uncovering drifts over bottom levels in boundaries and at height of planned man-made deposit are driven in ore, while at the level fixing the end of sinking jobs in the first stage outlines internal dump is cyclically piled to locate uncovering drifts therein. Said internal dump divides quarry space into zones of gotten and not gotten jobs. Simultaneously, man-made deposit is formed bordering upon quarry mined out space and internal dump. Now, proceeding with development of main deposit reserves, man-made deposit is prepared.
EFFECT: higher efficiency.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD FOR MINING STEEPLY-DIPPING ELONGATED DEPOSITS | 1995 |
|
RU2097561C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS WITH INTERNAL SPOIL DISPOSAL | 2013 |
|
RU2528731C1 |
METHOD OF MINERAL OPENCAST MINING | 0 |
|
SU1730452A1 |
METHOD FOR OPEN-PIT MINING OF STEEPLY DIPPING MINERAL DEPOSITS | 1989 |
|
RU2013550C1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
METHOD FOR OPEN EXTRACTION OF STEEP-FALLING DEPOSITS WITH INTERNAL DUMP-FORMING | 2002 |
|
RU2246620C2 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2256795C1 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD OF OPEN MINING OF STEEP-DIPPING MINERAL DEPOSITS | 0 |
|
SU1761954A1 |
Authors
Dates
2013-11-20—Published
2012-05-23—Filed