METHODS AND DEVICE FOR PLANNING AND DYNAMIC UPDATE OF SAMPLING OPERATIONS DURING DRILLING IN UNDERGROUND FORMATION Russian patent published in 2013 - IPC E21B49/08 

Abstract RU 2502870 C2

FIELD: oil and gas industry.

SUBSTANCE: method involves identification of a variety of processes and their parameters; with that, processes include drilling and sampling processes and parameters include drilling and sampling parameters. Also, the method involves processing of parameters for each of the processes by means of a special modelling processor creating forecasts related to formation sampling. With that, special modelling processor includes at least one of simulators of a well shaft hydraulic system, a simulator of filter cake of drilling mud, a simulator of formation stream or a simulator of tool feedback. The method also involves classification of forecasts related to formation sampling based on at least one of sample fluid medium quality, duration of sampling process, productivity of sampling process or cost of sampling, and planning of sampling operation based on classified forecasts.

EFFECT: improving efficiency or productivity of a sampling operation of formation fluid medium or operation.

25 cl, 15 dwg

Similar patents RU2502870C2

Title Year Author Number
WELL DRILLING TOOL, TOOL FOR EVALUATION OF PARAMETRES OF FORMATION AND EVALUATION METHOD OF PARAMETRES OF FORMATION BY MEANS OF WELL TOOL 2006
  • Longfild Kolin
RU2404361C2
DEVICE AND METHOD FOR DETERMINATION OF BED PARAMETER 2009
  • Ajan Kosan
  • Kuchuk Fikri Dzhon
  • Ramakrishnan Terizkhandur S.
  • Nevill Tomas Dzh.
  • Ramamurtkhi Ragkhu
  • Karnegi Ehndrju
RU2457326C2
DOWNHOLE TOOL AND METHOD FOR UNDERGROUND RESERVOIR DATA ACCUMULATION 2002
  • Pop Dzhulian
  • Follini Zhan-Mark
RU2319005C2
HYDRAULIC FRACTURING METHOD OF UNDERGROUND FORMATIONS DURING THEIR DRILLING 2008
  • Dzhonson Ehshli
  • Dzheffrajs Bendzhamin P.
  • Braun Dzh. Ehrnest
RU2502866C2
HIDRAULIC PUMP SYSTEM FOR THE DOWNHOLE TOOL (VARIATIONS), CONTROL METHODS FOR THE INDICATED PUMP AND OPERATION METHODS OF THE PUMP'S SYSTEM FOR THE DOWNHOLE TOOL 2007
  • Tsiglenek Rajnkhart
  • Vil'Jareal' Stiven Dzh
  • Khefel' Al'Bert
  • Svinbern Piter
  • Staker Majkl Dzh
  • Follini Zhan-Mark
RU2442021C2
SAMPLE CAPTURE PRIORITISATION 2012
  • Vilyareal Stiven
  • Pop Dzhulian
  • Khak Shakhid A.
RU2598390C2
MEASUREMENT METHODS AND DEVICES FOR FILTRATION POTENTIALS AND DETERMINATION OF CHARACTERISTICS OF UNDERGROUND FORMATION 2005
  • Chehn' Min'-I
  • Ragkhuraman Bkhavani
  • Brajant Jan
  • Sapp Majkl G.
  • Navarro Khose
RU2402048C2
SAMPLING DEVICE AND METHODS OF SAMPLES OF FORMATION FLUID MEDIUM 2007
  • Zazovskij Aleksandr F.
  • Longfild Kolin
  • Pop Dzhulian Dzh.
  • Tsimmerman Tomas Kh.
  • Shervud Dzhon D.
  • Berdzhess Kit A.
RU2436951C2
METHOD TO INVESTIGATE BEDS IN PROCESS OF OIL AND GAS WELLS DRILLING AND SAMPLER FOR ITS REALISATION 2012
  • Malyuga Anatolij Georgievich
RU2492323C1
DIRECTED SAMPLING OF FORMATION FLUIDS 2010
  • Pop Dzhulian Dzh.
  • Korr P'Er-Iv
RU2556583C2

RU 2 502 870 C2

Authors

Pop Dzhulian Dzh.

Chan Jun

Dates

2013-12-27Published

2009-10-28Filed