Abstract RU 2622965 C1

FIELD: oil and gas industry.

SUBSTANCE: according to method, before carrying out the water shutoff treatment, the size of the new perforation interval is determined by the oil and water ratio in the well production. The insulating compound is prepared in a volume exceeding the internal volume of the well from the bottom hole to the upper limit of the perforation interval. The grout pipe string is lowered into the well. The insulating compound is poured into the well at least up to the upper limit of the perforation interval with the overflush in the formation. The insulating compound with different mobility values is poured into different levels of the perforation interval. Then the grout pipe string is extracted from the well. The insulating compound is left till it is cured. It is hold for time additional to the time for curing the insulating compound, to lower the water cone. After the time of curing the insulating compound and the time of lowering the water cone has expired, the insulating compound is drilled out. The formation is opened by gently perforating the well in the uppermost part of the formation. Before pouring the insulating compound, the inner space of the well is filled below the upper limit of the perforation interval with the jamming compound through the grout pipe string. A blind plug is lowered into the well and installed below the upper limit of the perforation interval.

EFFECT: increased efficiency and reliability of carrying out water shutoff treatment in a well.

11 cl, 3 dwg

Similar patents RU2622965C1

Title Year Author Number
PROCEDURE FOR WATER SHUTOFF TREATMENT IN WELL 2016
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2618538C1
METHOD AND SYSTEM FOR WATERPROOFING WORKS IN WELL 2014
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2586120C2
METHOD OF WATER SHUTOFF WORKS IN WELL 2016
RU2613382C1
PLANT FOR WATER INSULATION WORKS IN WELL 2014
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2605974C2
METHOD FOR WATER ISOLATION IN THE BOTTOM-HOLE ZONE OF THE PRODUCTION WELL 2021
  • Dergunov Yurij Anatolevich
RU2772069C1
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Kuzjaev Ehl'Mir Sattarovich
  • Apasov Renat Timergaleevich
RU2539047C1
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Dolgushin Vladimir Alekseevich
  • Yagafarov Alik Kayumovich
  • Ankudinov Aleksandr Anatolevich
  • Popova Zhanna Sergeevna
  • Zhaparova Darya Vladimirovna
  • Ponomarev Andrej Aleksandrovich
RU2620684C1
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2504650C1
METHOD OF INCREASING OIL YIELD IN INHOMOGENEOUS, HIGHLY-FLOODED, POROUS AND FRACTURED-POROUS, LOW- AND HIGH-TEMPERATURE PRODUCTIVE STRATUM 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Mukhametshin Vadim Gabdulovich
  • Sakhipov Damir Midkhatovich
  • Apasov Renat Timergaleevich
RU2528805C1

RU 2 622 965 C1

Authors

Salikhov Mirsaev Mirgazyamovich

Mukhliev Ilnur Rashitovich

Sagidullin Lenar Rafisovich

Dates

2017-06-21Published

2016-04-14Filed