FIELD: machine building.
SUBSTANCE: method involves uncovering of a pipeline on one side of a trench below design depth so that a groove is created. Then, the pipeline is buried to design levels under action of gravity force and movement of grounds (sand clay, sand) to the groove side. In order to provide the pipeline burial to the required value, gravity depth hg is determined by the following formula:
EFFECT: reduction of costs and labour intensity owing to reducing the number of working operations and working personnel.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERWATER PIPE LINE | 1995 |
|
RU2081366C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERGROUND PIPE LINE | 2001 |
|
RU2196269C2 |
METHOD FOR REPAIR OF SAGGING AND EXPOSED SECTIONS OF UNDERWATER PIPELINE | 0 |
|
SU1712729A1 |
PIPELINE SECURING METHOD | 2001 |
|
RU2227238C2 |
METHOD OF REPAIRING SAGGING AND DEGRADED PARTS OF UNDERGROUND PIPELINES | 2006 |
|
RU2325579C2 |
METHOD OF FORMATION OF TRENCHES BY BLAST | 1988 |
|
RU2068170C1 |
DEVELOPMENT METHOD OF REPAIR TRENCH FOR REPLACEMENT OF DEFECT SECTION OF PIPELINE | 2019 |
|
RU2720893C1 |
METHOD FOR INSTALLING UNDERWATER PIPELINE IN DESIGN POSITION | 2014 |
|
RU2587730C1 |
METHOD TO FILL UP PIPELINE LAID INTO UNDERWATER TRENCH | 2012 |
|
RU2515584C1 |
INCREASING PIPELINE LAYING DEPTH | 2013 |
|
RU2566878C2 |
Authors
Dates
2014-01-20—Published
2011-12-28—Filed