FIELD: construction.
SUBSTANCE: invention relates to pipeline transport and may be used in erection of pipelines in crossings via water obstacles. In the proposed method the underwater pipeline is fixed by links with length l and distance between them L, values of which are produced by calculations. Then the pipeline is filled between produced links. Afterwards the remaining sections of the pipeline are filled. Links on the pipelines may be temporary reinforced concrete or metal balance weights at the distance k between them, the value of which is determined by means of calculations.
EFFECT: rationalisation of filling, with lower probability of pipeline leaving its design position.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING UNDERWATER PIPELINE | 0 |
|
SU1002466A1 |
METHOD FOR INSTALLING UNDERWATER PIPELINE IN DESIGN POSITION | 2014 |
|
RU2587730C1 |
METHOD TO DISMANTLE MANIFOLD PIPELINE | 2014 |
|
RU2565118C2 |
REINFORCED CONCRETE WEIGHTING MATERIAL AND COMBINATION BELT FOR SUCH WEIGHTING MATERIAL | 2003 |
|
RU2226635C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERGROUND PIPE LINE | 2001 |
|
RU2196269C2 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
METHOD FOR SUBSURFACE PIPELINING IN WETLAND AREAS ON TYPE I SWAMPS | 2017 |
|
RU2654557C1 |
METHOD FOR REPAIR OF UNCOVERED SECTION OF UNDERWATER PIPELINE | 1992 |
|
RU2029013C1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
Authors
Dates
2014-05-10—Published
2012-11-14—Filed