FIELD: construction.
SUBSTANCE: formwork is fixed to the frame so that the level at which it is supported by the frame can be regulated by means of movement between at least the first level over the floor surface selected for concrete pouring and the second level at which formwork is separated from hardened concrete or not supported by the frame.
EFFECT: invention provides both means for formwork support during concrete pouring and means for formwork stripping after concrete hardening.
15 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SHUTTERING FORMWORK UNIT | 2015 |
|
RU2696743C1 |
FORMWORK FOR CONCRETE AND SUPPORTING POST FOR FORMWORK | 2015 |
|
RU2697354C2 |
IMPROVED FALSEWORK SUPPORT | 2012 |
|
RU2570209C2 |
SUPPORTING ELEMENT OF FORMWORK | 2013 |
|
RU2637693C2 |
ASSEMBLED PROTECTIVE SCREEN FOR PERIMETER FENCING | 2017 |
|
RU2736256C2 |
METHOD OF CONCRETE PLATFORM MANUFACTURING, CONCRETE PLATFORM, AND CONNECTION ELEMENT | 2010 |
|
RU2504617C2 |
PANEL-SUPPORTING BRACKET | 2013 |
|
RU2640066C2 |
IMPROVED FORMING BLOCK | 2017 |
|
RU2744422C2 |
METHOD TO ERECT MONOLITHIC REINFORCED CONCRETE FRAMES | 2013 |
|
RU2541996C1 |
ADAPTER FOR A FORMWORK SUPPORT STRUCTURE | 2015 |
|
RU2684266C2 |
Authors
Dates
2014-01-27—Published
2008-12-04—Filed