FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises drilling ascending well section in oil hole with two exposed zones equipped with filters, filtration zone and steam injection zone and bottom located under roof at least 2 m, locating of production string with centralisers in said section for cyclic injection of heat carrier via them and oil string for oil extraction and before lowering said heat insulated string with pump, isolation of pipe space between filter and string, and locating the pump in oil string abode the filter in the boundaries of productive bed toe but under ascending section bottom. In compliance with this invention, identical design inclined wells are located at the angle to each other so that productive bed space accommodates one well steam injection zone is located above extraction zone of the other well by 5-10 m and 2-10 m lower then bed roof. Note here that spacing between adjacent inclined directed wells is kept equal to 30-100 m. Thick oil and bitumen are extracted with intermittent or continuous injection of steam and oil extraction.
EFFECT: higher efficiency.
2 cl, 1 ex, 1 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR EXTRACTION OF HIGH VISCOUS OIL FROM DEVIATING HOLE BY METHOD OF STEAM CYCLIC PUMPING INTO RESERVOIR | 2010 |
|
RU2436943C1 |
METHOD OF DEVELOPMENT OF HIGH-VISCOSITY OIL FIELDS WITH STRATA OF SMALL THICKNESS BY WAY OF CYCLIC INJECTION OF SOLVENT AND STEAM INTO SINGLE INCLINED WELLS | 2010 |
|
RU2455475C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2007 |
|
RU2350747C1 |
METHOD FOR OIL PRODUCTION | 2012 |
|
RU2481466C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT BY A SYSTEM OF WELLS WITH SIDE HORIZONTAL SHAFTS (SHS) | 2015 |
|
RU2599995C1 |
PRODUCTION METHOD OF HIGH-VISCOUS OIL BY MEANS OF SIMULTANEOUS PUMPING OF STEAM AND EXTRACTION OF LIQUID FROM SINGLE HORIZONTAL WELL | 2011 |
|
RU2456441C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2599676C1 |
METHOD FOR VISCOUS OIL OR BITUMEN DEPOSIT FIELD DEVELOPMENT | 2006 |
|
RU2305762C1 |
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS | 2023 |
|
RU2803344C1 |
Authors
Dates
2014-02-20—Published
2012-07-27—Filed