FIELD: heavy duty crane structures.
SUBSTANCE: proposed crane structure beam with overhanging ends and columns connected into common structure. Beam is connected with each column by rigid head. Base of column is provided with hack beam. Foundation of column is made hollow for filling up with slag or crushed stone, and is provided with bay under jack beam for hydraulic jack. Hydraulic jack is installed in center of column thrusting against column base from below and resting on slag or crushed stone for stabilizing design mark of foundation and portal crane structure. Jack beam is rigidly connected with column foundation by anchor bolts provided with support nuts under jack beam and attachment nuts over said beam.
EFFECT: increased service life of structure, reduced metal usage, labor input in manufacture and straightening.
2 tbl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
CRANE RUNWAY STRUCTURE | 2001 |
|
RU2227117C2 |
FOUNDATION FOR ECCENTRIC LOADED COLUMN | 2002 |
|
RU2225480C2 |
PROCEDURE RESTORING DESIGN POSITION OF SUNK COLUMN OF FRAME | 2000 |
|
RU2188278C2 |
METHOD TO CONTROL STRESSED STATE OF DOUBLE-SPAN BUILDING FRAME WITH THE USE OF FOUNDATIONS WITH JET ENGINES | 2005 |
|
RU2319811C2 |
DOUBLE-SPAN BUILDING FRAME | 2005 |
|
RU2319817C2 |
METHOD TO CONTROL DISPLACEMENT, SETTING AND HEELING OF STRUCTURE BY PILED FOUNDATIONS, BEING MACROREGULATORS | 2008 |
|
RU2416696C2 |
METHOD OF TESTING FRAMES AND STRUCTURES USING HYDROPULSATION INSTALLATIONS DURING STATIC AND DYNAMIC EFFECTS | 2008 |
|
RU2418277C2 |
CONTROL METHOD FOR SETTLED FOUNDATION SETTLEMENT | 2002 |
|
RU2230157C2 |
METHOD OF JACKING RAIL AND CRANE BEAM BY HYDRAULIC JACK | 2009 |
|
RU2458847C2 |
METHOD TO CONTROL NON-UNIFORM SETTLEMENT OF BUILDING ERECTED ON STRIP FOUNDATION | 2005 |
|
RU2319810C2 |
Authors
Dates
2004-09-10—Published
2002-05-07—Filed