FIELD: construction.
SUBSTANCE: invention relates to hydraulic engineering and nature conservation construction and may be used to protect coastal areas, roads and other facilities against landslides and collapses of soil massifs. The method includes stepped installation of gabions and heavy fascines neat the foot of the collapsed slope. Along the foot of the first step a pile grid 13 is arranged, made of a group of piles 14, driven into the base at a certain distance from each other along one line. A lathing 15 is attached to the upper parts of piles from metal profiled beams, which form the pile grid 13. The lathing is arranged along the height of the first step. Behind the pile grid 13 along the length of the first section they put at length three rows of heavy fascines 4 and connect them to each other. Then on top of rows of heavy fascines 4 perpendicularly to it they lay gabion mats 5. Gabion mats 5 with drainage devices that form sites of steps 1, 2, 3, are made as cut into the collapsed soil massif and with an inclination towards the steps. On top of the last stage the gabion mat 6 of the site they build further along the line of possible collapse of the massif to its stable soils.
EFFECT: increased efficiency and reliability of system operation as an anti-landslide structure.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
ANTI-LANDSLIDE SYSTEM OF BIOPOSITIVE DESIGN | 2012 |
|
RU2512201C2 |
LANDSLIDE PROTECTION STRUCTURE OF COMBINED DESIGN | 2013 |
|
RU2527034C1 |
METHOD TO ERECT ANTI-LANDSLIDE STRUCTURE OF COMBINED DESIGN | 2012 |
|
RU2512199C2 |
METHOD FOR CONSTRUCTION OF LANDSLIDE PROTECTION STRUCTURE OF BIOPOSITIVE | 2015 |
|
RU2582814C1 |
LANDSLIDE PROTECTION STRUCTURE OF BIOPOSITIVE DESIGN | 2015 |
|
RU2582813C1 |
METHOD OF ERECTING RETAINING WALLS FOR PROTECTION OF ZONES OF RIVER BANKS FROM CAVING AND EROSION | 2016 |
|
RU2645334C2 |
METHOD TO ERECT RETAINING WALL OF BIOPOSITIVE DESIGN | 2010 |
|
RU2449081C2 |
RETAINING WALLS OF BIOPOSITIVE DESIGN | 2009 |
|
RU2399717C1 |
COMBINED RETAINING WALL | 2022 |
|
RU2800958C1 |
METHOD FOR ERECTION OF COMBINED DRAIN OF BIOPOSITIVE DESIGN | 2009 |
|
RU2398931C1 |
Authors
Dates
2014-04-10—Published
2012-05-04—Filed