FIELD: construction.
SUBSTANCE: invention relates to the field of construction and may be used in assembly of trussed girders in covers of buildings and structures of various purpose. The method of assembly includes the following operations: prior to transportation of a girder to a construction site, its stands are fixed to the beam with mounting hinges, then during assembly of the girder the stands are turned along the axis of the beam around assembly hinges to achieve orthogonal position relative to the beam. The stands are turned with an assembly rope with the help of a tightening accessory.
EFFECT: reduced costs for transportation of a trussed girder to a construction site and its simplified assembly.
14 dwg
Title | Year | Author | Number |
---|---|---|---|
DOUBLE-BELT PRE-STRESSED WIRE SYSTEM | 2010 |
|
RU2439256C1 |
MODULAR CONSTRUCTION STRUCTURE | 2013 |
|
RU2528348C1 |
MULTI-SECTION BUILDING STRUCTURE | 2014 |
|
RU2567931C1 |
STEEL ROPE ROOF | 2014 |
|
RU2567588C1 |
DESIGN OF PRE-STRESSED BEAM | 2013 |
|
RU2540698C1 |
ROOF CONSTRUCTION METHOD | 0 |
|
SU912872A1 |
PROCESS OF MOUNTING OF PRESTRESSED STRUTFRAMED BEAM | 2002 |
|
RU2208104C1 |
TRUSSED GIRDER | 2017 |
|
RU2668624C1 |
PRESTRESSED TRUSSED BEAM | 2001 |
|
RU2186913C1 |
RETICULAR DOME | 1999 |
|
RU2166036C2 |
Authors
Dates
2014-04-27—Published
2012-08-07—Filed