FIELD: process engineering.
SUBSTANCE: proposed plant comprises compressor and drier interconnected by pressure pipe. Note here that said drier has the housing with drying and recovery zones, drum fitted to run in said housing and including recoverable drying agent. Note here that said recover zone includes first subzone and second subzone. Note also that two recovery pipelines are connected to pressure pipeline. First recovery pipeline for compressed gas with first temperature to be forced there through is connected to first subzone inlet. Second recovery pipe is connected to second subzone inlet. Note that second recovery pipeline incorporates heater of compressed gas forced through said pipeline to temperature higher than said first one.
EFFECT: higher efficiency.
14 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DRIER FOR COMPRESSED GAS, COMPRESSOR PLANT CONTAINING DRIER AND METHOD OF GAS DRYING | 2014 |
|
RU2633572C1 |
COMPRESSED GAS DEHYDRATOR, COMPRESSOR PLANT EQUIPPED WITH SUCH DEHYDRATOR, AND GAS DRYING METHOD | 2015 |
|
RU2690351C2 |
COMPRESSED GAS DRYER, COMPRESSOR UNIT CONTAINING DRYER, AND METHOD FOR DRYING COMPRESSED GAS | 2020 |
|
RU2808090C2 |
METHOD OF GAS COMPRESSION AND DRYING AND COMPRESSOR PLANT WITH DRIER | 2010 |
|
RU2511364C2 |
COMPRESSOR INSTALLATION WITH DEVICE FOR DRYING COMPRESSED GAS AND METHOD FOR DRYING COMPRESSED GAS | 2017 |
|
RU2685126C2 |
COMPRESSED GAS DRYING PLANT | 2016 |
|
RU2683827C1 |
COMPRESSOR UNIT AND METHOD OF SUPPLYING COMPRESSED GAS | 2020 |
|
RU2802312C2 |
STATIC DRYER | 2019 |
|
RU2799995C1 |
GAS DRIER | 2010 |
|
RU2516636C2 |
METHOD FOR CONTROL OF COMPRESSOR UNIT AND COMPRESSOR UNIT | 2009 |
|
RU2468281C2 |
Authors
Dates
2014-05-10—Published
2010-07-30—Filed