FIELD: mining.
SUBSTANCE: method of steering control of the working element for hole making in quick grounds and marshy grounds comprises immersing or rising the working element in case of deviation from the trajectory. At that the immersing or rising the working element is carried out by changing its weight. When emersion of the working element its weight is increased by supplying filler in the adjusting chamber of the working element. While immersing the working element as it moves the weight of the working element is decreased by removing a part of the filler from the said chamber of the working element.
EFFECT: immersion or emersion of the working element in the ground.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRAW-IN PIPING IN GROUND (VERSIONS) | 2007 |
|
RU2344241C1 |
METHOD TO PRODUCE WELLS IN SOIL FOR TRENCHLESS INSTALLATION OF UTILITIES (VERSIONS) | 2012 |
|
RU2495198C1 |
METHOD OF TRENCHLESS INSTALLATION OF BUNDLE OF PIPES IN SOIL | 2012 |
|
RU2502848C1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF UNDERGROUND SERVICE LINES | 1996 |
|
RU2103447C1 |
METHOD OF TRENCHLESS LAYING OF PIPELINES | 2023 |
|
RU2818796C1 |
METHOD OF TRENCHLESS PIPING OF PIPELINES IN GROUND | 2017 |
|
RU2645323C1 |
PROCESS OF FORMATION OF HORIZONTAL HOLES | 1998 |
|
RU2156847C2 |
METHOD FOR CONSTRUCTING A TUNNEL AND DEVICE FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2244830C1 |
METHOD AND DEVICES FOR DRIVING BORE-HOLES IN GROUND AT LAYING UNDERGROUND SERVICE LINES UNDER OBSTACLE | 1996 |
|
RU2127348C1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF PIPELINE MADE OF NON-METAL MATERIALS | 1997 |
|
RU2142536C1 |
Authors
Dates
2014-06-10—Published
2012-10-16—Filed