FIELD: construction.
SUBSTANCE: method includes formation of a pioneer well along the design axis of the installed bundle of pipes between working and receiving pits and simultaneous installation of a drilling bar in it, which is connected to the working organ, subsequent expansion of the pioneer well to the design diameter by soil damage with the help of the working organ, simultaneous transportation of damage products with the help of a cleaning agent into the space between the expanded pioneer well and the bundle of pipes and installation of the bundle of pipes in the expanded pioneer well.
EFFECT: increased reliability of installation of a bundle of pipes without complications related to sags of surface above a well.
3 dwg
Authors
Dates
2013-12-27—Published
2012-07-03—Filed