FIELD: construction.
SUBSTANCE: pile is arranged in the following way. A well is drilled for vertical bored shaft 1. Bored shaft 1 with a cavity for drive shaft 3 is made. Arrangement works of drive shaft 3 are performed and the rest space between bored and drive shafts is filled with small-grain concrete 5. After that, monolithic foundation frame 6 is arranged, and the obtained pile structure is rigidly attached to it.
EFFECT: increasing load-carrying capacity and reducing material consumption.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
PRECAST PILE WITH WIDENING | 2016 |
|
RU2646267C1 |
METHOD FOR ERECTING A BORED PILE OF INCREASED LOAD-BEARING CAPACITY FOR CONSTRUCTION IN SEISMIC AREAS | 2021 |
|
RU2761795C1 |
METHOD OF REINFORCEMENT OF FOUNDATIONS | 2008 |
|
RU2360071C1 |
METHOD OF BUILDING FOUNDATION FOR RESERVOIR | 2002 |
|
RU2209884C1 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
METHOD FOR ERECTION OF FOUNDATION, FOUNDATION AND PILE | 2008 |
|
RU2386752C2 |
METHOD OF INSTALLATION OF PILES ON MACROPOROUS SOILS | 2022 |
|
RU2800801C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR PRODUCTION OF BORE PILE | 2015 |
|
RU2596170C1 |
Authors
Dates
2014-06-20—Published
2012-12-26—Filed