FIELD: mining.
SUBSTANCE: proposed method comprises mechanised pre-working and stabilisation in coal massif, protection of opened space against adjacent column by coal post. Compensation cavities are made in virgin massif, nearby bed soil, and separated by coal post. Cavities and coal posts there between on massif side and opened space are arranged in staggered manner. Width, height and depth of cavities are defined on the basis of coal seam mining and geological conditions and heading machine performances. Coal post width between compensation cavities is calculated with due allowance for empirical factor equal to 1.3 at working in virgin massif and equal to 1.6 at working in adjacent column abutment pressure zone, seal depth (post height) and seam cubical compression strength.
EFFECT: higher stability of working, lower losses of coal in posts, no need in additional barring.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
METHOD OF PREVENTION OF DEVELOPMENT ENTRIES IN COAL BED AREAS | 2007 |
|
RU2341657C1 |
UNDERGROUND MINING METHOD IN AREAS HAVING LIMITED DIMENSIONS | 2005 |
|
RU2282720C1 |
METHOD OF PROTECTION OF IN-BED MINE WORKINGS | 1997 |
|
RU2172837C2 |
METHOD FOR UNDERGROUND MINING OF COAL BEDS | 2011 |
|
RU2441160C1 |
METHOD OF UNDERGROUND DEVELOPMENT OF MINERAL DEPOSITS | 2020 |
|
RU2736107C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD OF MINING THIN AND MEDIUM-THICK SEAMS OF MINERAL RESOURCE OUT OF PROTECTIVE PILLARS UNDER WATER OBJECTS | 0 |
|
SU1803559A1 |
METHOD OF DRIVING PAIRED WORKINGS ON THIN FLAT COAL BEDS WITH LEAVING ROCK IN MINE | 2024 |
|
RU2827324C1 |
PROTECTION METHOD OF REUSABLE DEVELOPMENT WORKINGS | 2011 |
|
RU2472935C1 |
Authors
Dates
2014-06-27—Published
2013-05-06—Filed