FIELD: mining.
SUBSTANCE: proposed method comprises opening, preparing and working of the section of chambers, preparing of filling mix of potassium dressing wastes and filling of chambers. Working section is opened in drifts from overlying bed. After processing of said section by cleanup chambers, the latter are filled with filling mix with addition of calcium chloride. Filling mix is fed over drifts from overlying bed by gravity. After filling of said chambers, impermeable dams are erected at drift start. Subject to mining and geological conditions, said filling mix can be fed to every chamber or set of chambers via wells drilled from working of overlying bed. Then, wells are plugged.
EFFECT: decreased volume of mining job, larger volumes of disposal.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
METHOD FOR EXTRACTING SALT DEPOSITS | 2003 |
|
RU2235879C1 |
METHOD OF UNDERGROUND STORAGE OF SALT AND SLIME WASTE | 0 |
|
SU1058836A1 |
METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD | 2005 |
|
RU2303132C1 |
METHOD OF MINING A SERIES OF ADJOINING STRATA WITH COMPLEX HYPSOMETRY | 0 |
|
SU1555491A1 |
METHOD FOR GENTLY SLOPING POTASH BED MINING | 2004 |
|
RU2253733C1 |
METHOD OF SLANT COAL SEAMS DEVELOPMENT | 1994 |
|
RU2068498C1 |
METHOD OF LAYER-BY-LAYER LAYING OF CLAY-SALT SLIMES AND SALT WASTES IN ONE CHAMBER | 2009 |
|
RU2410543C1 |
METHOD OF CREATING WATER-RESISTANT FILLING MASS | 2016 |
|
RU2642750C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
Authors
Dates
2014-07-10—Published
2013-03-12—Filed