FIELD: instrumentation.
SUBSTANCE: analyser comprises reservoir capacitor charged at 1st and 3rd quarters of supply voltage periods by intermittent current. Their discharge occurs smoothly in time at 2nd and 4th quarters of supply voltage periods. Note here that said capacitors are connected in pairs to phase and zero conductors of electric circuit via diode and transistors connected in series therewith with allowance for polarity of said connection of electrolytic capacitors. The latter make two bridge circuits operating in turns in positive and negative half-waves of supply voltage. Thyristor and throttle are connected in series to bridge circuit diagonal to connect every pair of reservoir capacitors for their smooth discharge back into circuit. Note here that windings of both throttles are fitted on common magnetic core with its flux reversal. Transistor and thyristor are ON/OFF by control unit timed by supply voltage.
EFFECT: compact and high-efficiency device.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
ELECTRIC METERS OPERATION SCIENTIFIC INSTRUMENT | 2014 |
|
RU2568936C1 |
DEVICE FOR ELECTRICITY METERING VERIFICATION | 2013 |
|
RU2523783C1 |
DEVICE FOR TESTING OF INDUCTIVE ELECTRIC METERS | 2014 |
|
RU2569178C1 |
DEVICE FOR TESTING OF ELECTRIC METERS | 2014 |
|
RU2572165C1 |
DEVICE FOR TESTING OF INDUCTIVE ELECTRIC METRES | 2012 |
|
RU2498323C1 |
DEVICE TO CONTROL ELECTRIC METERS | 2012 |
|
RU2521782C1 |
CONTROL CIRCUIT OF BRIDGE DEVICE THYRISTOR FOR ESTIMATION OF INDUCTION ELECTRIC METERS SUITABILITY | 2015 |
|
RU2573700C1 |
DEVICE FOR TESTING OF INDUCTIVE ELECTRIC METERS | 2013 |
|
RU2532861C1 |
BRIDGE DEVICE FOR INSPECTING ELECTRICITY METERS OF ACTIVE ENERGY | 2016 |
|
RU2625717C1 |
CONTROL CIRCUIT FOR INDUCTION ELECTRICITY METERS | 2013 |
|
RU2521763C1 |
Authors
Dates
2014-07-20—Published
2013-03-20—Filed