FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises forcing working fluid via short pipe of string to top seam and working fluid via long pipe tubing equipped packer to bottom seam. Going-in of downhole instruments or inserted pipe via control head and long pipe string. Well is analysed by downhole surveying instruments. Technological jobs are performed with the help of inserted pipe. Downhole instruments are lowered in well via control head and long pipe string, forcing working agent via long pipe string is maintained under operating conditions while forcing via short pipe string is continued or terminated. In making technological jobs, inserted pipe is lowered in well via control head and long pipe string to stop forcing via long pipe string.
EFFECT: geophysical survey or technological jobs with lifting pipe string.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF THE INJECTION WELL WITH SIMULTANEOUS-SEPARATE INJECTION OF FLUID | 2018 |
|
RU2695910C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
METHOD OF INJECTION WELL OPERATION WITH SINGLE-LIFT MULTI-PACKER ASSEMBLY | 2017 |
|
RU2655547C1 |
METHOD OF SIMULTANEOUSLY-DIVIDED SURVEY AND DEVELOPMENT OF MULTIPAY FIELD (VERSIONS) | 2008 |
|
RU2371576C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD OF DEVELOPMENT OF OIL MULTILAYER DEPOSIT | 2019 |
|
RU2726664C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD FOR WELL OPERATION AT SIMULTANEOUS SEPARATE PUMPING OF WORKING MEDIUM | 2012 |
|
RU2481464C1 |
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING | 2016 |
|
RU2622961C1 |
WELL OPERATION METHOD | 2010 |
|
RU2425961C1 |
Authors
Dates
2014-07-27—Published
2013-06-17—Filed