FIELD: blasting operations.
SUBSTANCE: fill stemming of blast holes with elements of stone material comprises the lower fill part of inert bulk materials over the air gap and the upper combined part. The upper combined part of the stemming is divided into two sections: the lower section with length of up to three diameters of the well, filled with elements of stone material with size of 0.2-0.6 diameter of the well, interstratified with the inert bulk material with the size less than 5 mm, and the upper, filled to the top of the well with the same inert bulk material.
EFFECT: invention enables to improve the efficiency of locking the detonation products in the charging cavity by the combined shortened stemming and to reduce costs for its formation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563266C1 |
METHOD OF GOPHER HOLE FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2566522C1 |
STEMMING MACHINE FOR FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL | 2015 |
|
RU2600474C1 |
METHOD OF FORMING SHORT COMBINED FILLED STEM OF BLAST HOLES WITH SPACER CONE AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2608101C1 |
COMBINATION CHARGING TAMPING | 2006 |
|
RU2307311C1 |
COMBINED CHARGING TAMPING OF WELLS | 2011 |
|
RU2462688C1 |
COMBINATION STEMMING | 2006 |
|
RU2308674C1 |
SPACED-FILLED TAMPING | 2009 |
|
RU2390722C1 |
COMBINED STEMMING | 2006 |
|
RU2312303C1 |
Authors
Dates
2014-08-27—Published
2013-02-26—Filed