FIELD: blasting.
SUBSTANCE: tamping includes upper and lower parts, separated by the buffer gap of polystyrene foam. The lower part is the filling of inert bulk materials over the air gap. At the top of tamping on the buffer gap a cone for example of hardening materials is mounted with its end pointed upwards. Next to the top of the well the charging inert material is placed. Between the cone and the walls of the well the large gravel is placed.
EFFECT: improved reliability, lower costs.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
FILL STEMMING OF BLAST HOLES WITH ELEMENTS OF STONE MATERIAL | 2013 |
|
RU2526950C1 |
COMBINATION STEMMING | 2006 |
|
RU2308674C1 |
COMBINATION CHARGING TAMPING | 2006 |
|
RU2307311C1 |
METHOD OF GOPHER HOLE FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2566522C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563266C1 |
METHOD OF FORMING SHORT COMBINED FILLED STEM OF BLAST HOLES WITH SPACER CONE AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2608101C1 |
COMBINED STEMMING | 2020 |
|
RU2732777C1 |
SPACED-FILLED TAMPING | 2009 |
|
RU2390722C1 |
COMBINED SPREADING STEMMING | 2005 |
|
RU2291392C1 |
Authors
Dates
2012-09-27—Published
2011-02-28—Filed