FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to deep water drilling oil and gas platform designed for operation at arctic shelf. Semi-submersible catamaran-type drilling platform is arranged at two pontoons, platform hull being supported by stabiliser columns and tensioned vertical mooring, with computer-aided dynamic positioning with the help of underwater propulsors. Surface deck superstructures are composed of drilling, processing, power production and functional modules. Integrated control and safety systems are equipped with production equipment conditions monitoring means and emergency elimination means to actuate by remote means at well fluid flowing the device of static electricity charges elimination at drilling platform.
EFFECT: higher survivability of drilling platform at well fluid flowing.
5 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING HYDROCARBON DEPOSITS OF ARCTIC SHELF AND TECHNICAL SOLUTIONS FOR IMPLEMENTATION OF METHOD | 2013 |
|
RU2529683C1 |
METHOD TO PRESERVE HEAD OF EMERGENCY BLOWING DEEP-WATER OIL AND GAS WELL AND DEVICE FOR ITS REALISATION | 2010 |
|
RU2431032C1 |
METHOD OF OVERRIDING BLOWING DEEP-SEA OIL-AND-GAS WELL AND DEVICE TO THIS END | 2010 |
|
RU2441134C1 |
METHOD FOR ELIMINATION OF FLOWING WELLS AT OFFSHORE WELLS WITH UNDERWATER LOCATION OF WELLHEADS THEREOF | 2019 |
|
RU2726742C1 |
SELF-PROPELLED SEMI- SUBMERSIBLE OCEANOLOGICAL RESEARCH PLATFORM AND METHOD FOR ITS USE | 2006 |
|
RU2343084C2 |
SEMI-SUBMERSIBLE MULTIPURPOSE MARINE COMPLEX | 2021 |
|
RU2757512C1 |
METHOD FOR ADVANCE DRILLING OF PILOT SHAFTS DURING CONSTRUCTION OF WELLS ON SHELF | 2023 |
|
RU2818392C1 |
FPSO PLATFORM | 2010 |
|
RU2441129C1 |
DEVELOPMENT OF MARINE DEEP SEA OIL-AND-GAS DEPOSITS | 2013 |
|
RU2547161C2 |
HYDRAULICALLY DRIVEN DEVICE FOR SHEARING PIPES AT WELLHEAD OF FLOWING WELL | 2019 |
|
RU2717597C1 |
Authors
Dates
2014-09-27—Published
2012-12-10—Filed