FIELD: construction.
SUBSTANCE: invention relates to prefabricated floors of buildings. Prefabricated load-bearing structure of the ceiling includes a structural unit consisting of a perimeter beam of an I-beam section rigidly connected to a bed made of a wooden bar, which in its turn is connected to foundation of any kind, floor beams of I-section, which is fixed to beam of perimeter of I-beam section, and in place of their connection connecting structure is installed.
EFFECT: invention makes it possible to simplify the assembly of the floor.
8 cl, 5 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| PRODUCTION LINE FOR PREFABRICATED LOAD-BEARING STRUCTURES | 2021 |
|
RU2771270C1 |
| HONEYCOMB ASSEMBLY STRUCTURE | 2021 |
|
RU2794364C1 |
| FRAME-PANEL BUILDING | 2011 |
|
RU2582155C2 |
| METHOD OF CONSTRUCTING WOODEN FRAME OF BUILDING | 2024 |
|
RU2826688C1 |
| PREFABRICATED FRAME BUILDING | 2019 |
|
RU2713847C1 |
| CAPSULE STRUCTURE WITH BEARING BODY MADE OF SHEET MATERIALS | 2024 |
|
RU2832547C1 |
| STRUCTURAL SOLUTIONS (DESIGN) OF LOW STOREY HOUSE FROM WOODEN FRAME ELEMENTS WITH SHEET PLANKING AND INSULATION | 2014 |
|
RU2572107C1 |
| BUILDING FRAME | 2006 |
|
RU2397295C2 |
| METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
| FRAME-PANEL BUILDING | 2008 |
|
RU2380492C2 |
Authors
Dates
2022-02-08—Published
2020-05-04—Filed