FIELD: construction.
SUBSTANCE: method includes the installation along the platform perimeter of the protective cladding structure. Meanwhile before placing the platform into design position along the platform perimeter with a clearance at least one row of supports from metal piles with round section sunk into unstable bottom sediments or into bed rocks. Into piles the coolers are mounted, and artificial freezing of water and ground around piles, and the monolithic cylinders, formed around piles - ice and grounding in the base and icy in water, shall contact the adjacent cylinders, forming continuous ice and ground in the base and icy in water protective anti-chock and impervious wall.
EFFECT: improvement of efficiency of an engineering protection of platforms of a floating type in conditions of the Arctic shelf.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ENGINEERING PROTECTION OF FLOATING PRODUCTION PLATFORM FROM ICE EFFECTS UNDER CONDITIONS OF ARCTIC SHELF | 2015 |
|
RU2604888C1 |
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT | 2008 |
|
RU2382849C1 |
DEVICE FOR TEMPORARY HOLDING OF SEA DRILLING RIG ON ARCTIC SHELF | 1994 |
|
RU2092654C1 |
METHOD FOR ERECTION OF SEA ICY BASE | 0 |
|
SU1630346A1 |
METHOD OF ERECTION OF MARINE PLATFORM | 2001 |
|
RU2198261C1 |
METHOD OF CONSTRUCTING AN ICE-RESISTANT DRILLING PLATFORM ON THE SHALLOW SHELF OF THE ARCTIC SEAS | 2020 |
|
RU2737319C1 |
DEVICE OF ANTI-ICE PROTECTION FOR HYDRAULIC ENGINEERING STRUCTURE ARRANGED ON SHALLOW CONTINENTAL SHELF | 2014 |
|
RU2567562C1 |
METHOD OF FORMING SLEETPROOF COMPLEX FOR DEVELOPMENT OF OIL-GAS DEPOSITS ON ARCTIC SHELF AND SLEETPROOF COMPLEX FORMED BY THE METHOD | 1997 |
|
RU2123088C1 |
SEA STATIONARY PLATFORM FOR EXTRACTION OF HYDROCARBONS | 2010 |
|
RU2408764C1 |
METHOD FOR ERECTION OF ICE PLATFORM ON GROUND | 1995 |
|
RU2080440C1 |
Authors
Dates
2014-11-20—Published
2013-08-20—Filed