FIELD: oil and gas industry.
SUBSTANCE: double-packer pump unit includes a pipe string of a lesser diameter placed concentrically or eccentrically in a pipe string of a larger diameter. The pipe string of the larger diameter is equipped with the lower and upper packers with a cable input mounted over an electrically driven pump and a return valve. Below the lower packer and over the upper packer the lower criss-cross flow coupling, the lower drain valve and the upper criss-cross flow coupling, the upper drain valve are installed respectively. A control cable, for example, a fibreglass cable, may be laid along the whole equipment and through the packers. A circulation valve and a balancing valve are installed between the lower and upper packers. Above the drain valve the double-packer pump unit is equipped with a disconnector with a hydraulic anchor mounted above it.
EFFECT: improved operational efficiency of the unit and increased reliability of the circulation valve.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
TWO-PACKER ARRANGEMENT OF THE OIL-PRODUCING UNIT WITH INSULATION OF CASING LEAKAGE FAILURES | 2017 |
|
RU2651714C2 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
METHOD FOR OPERATING INJECTOR WITH MULTIPLE PACKER ASSEMBLY | 2014 |
|
RU2541982C1 |
WATER INFLUX INTERVAL SHUTOFF DEVICE IN OPEN HOLE OF HORIZONTALLY-BRANCHED WELL | 2013 |
|
RU2534118C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
METHOD AND EQUIPMENT FOR INTERVAL RESEARCH OF FORMATION PARAMETERS AT TUBES | 2016 |
|
RU2614169C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
SHARIFOV'S PACKER SYSTEM FOR ISOLATION OF NON-WORK PERFORATION RANGE OR UNTIGHT HOLE SECTION | 2009 |
|
RU2387802C1 |
DOWNHOLE PACKER SYSTEM WITH PUMP (VERSIONS) | 2006 |
|
RU2331758C2 |
PROCEDURE FOR INSULATING PERMEABLE SECTION OF PRODUCTION STRING OR PERFORATED INTERVAL OF IDLE FORMATION OF WELL (VERSIONS) | 2008 |
|
RU2383713C1 |
Authors
Dates
2014-12-10—Published
2013-09-13—Filed