FIELD: oil and gas industry.
SUBSTANCE: water influx interval shutoff device in an open hole of horizontally-branched well comprises a tubing string with packers run in hole. From below the tubing string by a hydraulic disconnecting switch is connected to a double-packer assembly consisting of two swellable packers interconnected by an inter-packer tube, which length exceed length of water influx in the well, at the lower end of the double-packer assembly there is a perforated tube which is in its initial position is covered hermetically by a bushing from inside and fixed by a shear pin, at that at the lower tube end there is a hydraulic whipstock that ensures ingress into an open hole of the horizontally-branched well, at that in the operating position the bushing moves downwards in a limited way under action of the gating element run in at the tubing string from the wellhead until it thrusts into the butt end of the hydraulic whipstock with opening of perforated holes of the tune and fixation in the tube below its perforated holes.
EFFECT: device allows increased operational reliability due to simplified design and sealing quality of the water influx interval in process of the well operation in result of use of water- and oil-swellable packers depending on type of the liquid in the interval wherein they are set, and shutoff of water influx intervals in an open hole of the horizontally-branched well, reduced costs for installation and maintenance in process of the well operation as the device is run in to the well separately from production equipment.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO DETERMINE WATER PRODUCTION INTERVALS AND TO ISOLATE THEM IN BOREHOLES OF MULTIHOLE HORIZONTAL WELLS | 2012 |
|
RU2514009C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR DEVELOPMENT OF MULTI-HOLE BRANCHED HORIZONTAL WELL | 2014 |
|
RU2581589C1 |
HORIZONTAL WELL OPERATION METHOD | 2014 |
|
RU2558090C1 |
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS | 2014 |
|
RU2578095C1 |
METHOD FOR ISOLATING THE INFLOW OF FORMATION WATER IN AN UNCASED HORIZONTAL SECTION OF THE WELLBORE | 2017 |
|
RU2661171C1 |
METHOD OF DELIVERING EQUIPMENT AT COILED TUBING TO SPECIFIED INTERVAL OF MULTIHOLE PRODUCTION WELL AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2449107C2 |
PROCEDURE FOR SURVEY OF MULTI-HOLE HORIZONTAL WELL | 2012 |
|
RU2513961C1 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOTS FROM HORIZONTAL WELL | 2019 |
|
RU2709263C1 |
Authors
Dates
2014-11-27—Published
2013-08-13—Filed