FIELD: oil-and-gas industry.
SUBSTANCE: proposed process comprises series of thermometer measurements at quasistationary injection in tubing in interval from its funnel upward to 30-40 m. these measurements are used to define casing pipe tightness above tubing funnel.
EFFECT: accelerated determination.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INJECTION WELLS RESEARCH (VERSIONS) | 1999 |
|
RU2154161C1 |
PROCESS OF EXAMINATION OF INJECTION HOLES ( VERSIONS ) | 1998 |
|
RU2151866C1 |
METHOD OF INVESTIGATING INJECTION WELLS (VERSIONS) | 1997 |
|
RU2121571C1 |
METHOD OF INVESTIGATING INJECTION WELLS | 0 |
|
SU1359435A1 |
METHOD OF LEAKAGE TEST OF FLOW STRING OF INJECTION WELL EQUIPPED WITH TUBING (Versions) | 2000 |
|
RU2168622C1 |
METHOD FOR INVESTIGATION OF INJECTION WELLS | 1997 |
|
RU2121572C1 |
METHOD OF DEFINING EXTREME FLUID FLOW RATES IN WELL (VERSIONS) | 2010 |
|
RU2441153C2 |
METHOD OF DETERMINATION OF FLUID FLOW IN ANNULAR SPACE OF INJECTION WELL | 2000 |
|
RU2171373C1 |
METHOD OF CHECKING FOR TIGHTNESS OF INJECTION WELL EQUIPPED WITH TUBING | 2000 |
|
RU2166628C1 |
DOWNHOLE TEMPERATURE PROBE ASSEMBLY (VARIANTS) | 2004 |
|
RU2303130C2 |
Authors
Dates
2014-12-20—Published
2013-02-25—Filed