FIELD: oil and gas industry.
SUBSTANCE: invention is related to oil industry and may be used for multiple hydraulic fracturing of the formation in horizontal shaft of a well. The method includes running in of a packer to the well on the flow string, performance of hydraulic fracturing in the first interval, formation of proppant plug, performance of hydraulic fracturing in the second interval. In order to obtain screening proppant plug concentration of the injected proppant is increased sharply up to 1100 kg/m3 and injection is stopped artificially due to increase of hydraulic resistance. The volume of injected mixture with increased concentration is calculated with consideration of filter part coverage in the first interval upon destruction of the cross-linked gel and complete settlement of proppant in the well bore. Upon completion of works on hydraulic fracturing in the first area withhold process is made for the period of destruction and complete settlement of unflushed proppant.
EFFECT: improving the hydraulic fracturing efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2011 |
|
RU2472926C1 |
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT | 2013 |
|
RU2539469C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2013 |
|
RU2526062C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
WELL OPERATION INTENSIFICATION METHOD | 2012 |
|
RU2494243C1 |
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE BED WITH CLAY LAYERS AND BOTTOM WATER | 2014 |
|
RU2544343C1 |
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER | 2014 |
|
RU2558058C1 |
PRODUCTIVE FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453695C1 |
FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453694C1 |
METHOD FOR IMPROVED WORK WELL | 2015 |
|
RU2582150C1 |
Authors
Dates
2014-12-20—Published
2014-02-10—Filed