MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT Russian patent published in 2014 - IPC E21B43/267 

Abstract RU 2526062 C1

FIELD: mining.

SUBSTANCE: proposed method comprises formation of fractures in different intervals of productive bed exposed by the well horizontal shaft by lowering the packer on pipe string. Packer is fitted in the well to feed hydraulic fracturing fluid in the filter mounted at every part of horizontal shaft corresponding to every said interval. Other parts are isolated to make fractures to be lined by forcing carrier fluid with proppant therein. Interval hydraulic fracturing is performed in direction from the face to head by pipe string lowering. Pipe string represents a string of flexible pipes with drillable packer at the end. Drillable packer seating is performed ahead of every section of the well horizontal shaft filter, fractures are produced and lined by forcing carrier fluid with proppant therein. To fix proppant in well zone, fixing solution is forced in pipe string at the rate of 0.5 m3 per 1 metre of filter length and into said zone in one and a half volume of pipe string. Thereafter, wellhead is sealed by wellhead gland. Well tubular space is lined out with hydraulic accumulator. Then, without decreasing hydraulic pressure in pipe string, it is lifted by 1 metre. Hydraulic accumulator takes up hydraulic pressure surge in well annulus while drillable packer tightly shuts off the filter section whereat hydraulic fracturing occurs. The, pipe string is withdrawn from the well to make interval hydraulic fracturing in other filter sections of the well horizontal shafts. At termination of hydraulic fracturing, pipe string at wellhead if equipped with drillable toll and jet head. Pipe string is lowered in the well to remove packers by drilling-out from wellhead to face. Then, drillable tool is cut out to force fluid in pipe string along with its rotation and displacement from face to head to jet processing of inner surface of filters via jet head.

EFFECT: higher efficiency and reliability, accelerated tripping processes.

3 dwg

Similar patents RU2526062C1

Title Year Author Number
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE 2015
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2601881C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667240C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Mansurov Ajdar Ulfatovich
RU2655309C1
METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667561C1
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT 2014
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2541693C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Vjacheslav Gajnanovich
RU2547892C1
FORMATION HYDRAULIC FRACTURING METHOD (OPTIONS) AND COUPLING FOR ITS IMPLEMENTATION 2021
RU2765186C1
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT 2013
  • Ismagilov Fanzat Zavdatovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2539469C1
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL 2013
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2537719C1

RU 2 526 062 C1

Authors

Salimov Oleg Vjacheslavovich

Zijatdinov Radik Zjauzjatovich

Sulejmanov Farid Bashirovich

Salimov Vjacheslav Gajnanovich

Zhirkeev Aleksandr Sergeevich

Dates

2014-08-20Published

2013-07-02Filed